Fill in the form below or contact our experienced engineers by calling +90 216 518 02 55 to get more information, to have your project studied and to get a hollow flooring system offer.
Reach us: +90 (216) 518 02 55
Send e-mail: info@absyapi.com.tr
Voided slabs are constructed biaxially through the use of cube shaped disposable formworks made of recycled PP that are placed between lower and upper steel reinforcement. Casting of concrete is always in-situ.
The products are placed at the intervals specified in the project and connected to the lower reinforcement. After the upper reinforcement is placed, concrete pouring begins. The most important point to be considered while pouring concrete is to pour the concrete in two phases so that the products do not float, but not to allow the formation of cold joints between the two castings. In the first casting, the concrete is poured until it completely covers the edges of the disposable formworks. According to the class of the concrete and the weather conditions, when the concrete is slightly plasticized the second casting is carried out and the flooring production is terminated. Vibrator should be used at every stage of concrete casting.
Please click this link for the Installation Manual.
Please click this link for Application Specification.
Safely use the voided slab system in your projects with our 10+ years of design, field, and application experience, the only one in Turkey.
Copyrights © 2020 All Rights Reserved by ABS Yapı Elemanları